Canon House and Parking Spaces Project No. PH 24-01 REBID
Project No: G-1153-25 REBID
Location: Washington County, PA
Owner: Redevelopment Authority of the County of Washington
Manager: Sarah Boyce
| Contractor | Contact Person | Bid Amount |
|---|---|---|
| Redevelopment Authority of the County of Washington 90 West Chestnut Street Ste. 700 Washington, PA 15301 | Tammy Mayton | N/A |
| AMS Construction & Remodeling, LLC 122 Brokaw Avenue Donora, PA 15033 | Aaron Szakal | |
| Hilltop Paving 1 Presto Sygan Road P.O. Box 292 Presto, PA 15142 | Karen Underwood | |
Bid Advertisement
The Redevelopment Authority of the County of Washington (RACW) will receive bids for the CANON HOUSE STEPS AND PARKING SPACES PROJECT NO. PH 24-01 REBID, until 11:00 A.M., prevailing time, on Friday, August 14, 2026, its office, 90 West Chestnut Street, Suite 700, Washington, Pennsylvania 15301, at which time and place all bids will be publicly opened and read aloud.
Interested parties may view the Profile and Bid Schedule for this Project on the internet at: www.niraengineers.com.
All Bid Documents are available via email request to bids@niraengineers.com. Only contract documents obtained directly from NIRA Consulting Engineers, Inc. will be accepted. Printed bid documents are available for a $60.00 fee with an additional charge of $15.00 when shipping is requested. Checks are to be made payable to NIRA Consulting Engineers, Inc. Questions are to be directed to Sarah Boyce at sboyce@niraengineers.com.
Each bid shall be accompanied by a bid guaranty, which shall not be less than ten percent (10%) of the total amount of the bid. The form of the guaranty shall be in accordance with the type permitted under the contract documents.
Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project; that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin or handicap.
The Redevelopment Authority of the County of Washington reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Redevelopment Authority of the County of Washington for a period not to exceed forty-five (45) days from the date of opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the contract. In no event will the Redevelopment Authority of the County of Washington consider a Contractor as eligible if he cannot initiate the work under the contract within 30 days of the contract execution and proceed to the successful completion of the work within 90 consecutive calendar days of the Notice to Proceed.
Project Scope
The project involves the concrete steps between the Canon House and Canon Apartments. The work involves the removal of the existing railing, the overlay of a new concrete surface on the steps, new hand railing and a new fabric canopy. Additionally, project involves the installation of three (3) new asphalt parking spaces between the Canon House and North Central Avenue. The new spaces will have an aggregate subbase, asphalt base and wearing courses, asphalt wedge curb, bollards, signage and line painting.
Bid Schedule
BID SCHEDULE
| Item No. | Description | Estimated Quantity | Unit |
|---|---|---|---|
1. | Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, and Fertilizer of All Disturbed Areas. | JOB | LS |
2. | Subbase Installation. Includes 4 Inch Depth PennDOT No. 2A Limestone Aggregate, Required Excavation, and Subgrade Preparation. | 90
| SY |
3. | PennDOT Class 4, Type A Geotextile Fabric. | 90 | SY |
4. | 9.5mm Asphalt Wearing Course (1-1/2 Inch Depth). | 90 | SY |
5. | 25mm Asphalt Binder Course (3 Inch Depth). | 90 | SY |
6. | Parking Stall Line Painting. | JOB | LS |
7. | Handicap Sign. | 2 | EA |
8. | Handicap Line Painting. | JOB | LS |
9. | Asphalt Wedge Curb. | 110 | LF |
10. | Select Demolition of Handrails and Stairs. Demolition to Include All Labor, Materials, Equipment and Disposal of Items Relating to the Railings, Concrete Slabs, Partial Demolition of the Stairs and Removal of Any Gravel or Soil Required for the Installation of the New Construction. | JOB | LS |
11. | New Concrete Stairs. This Includes All Labor, Materials, and Equipment Necessary to Provide New Concrete Stairs and Adjacent Concrete Slabs as Described in the Construction Drawings and Documents. | JOB | LS |
12. | New Aluminum Handrails. This Includes All Labor, Materials and Equipment Necessary to Install Handrails as Shown on the Construction Drawings. | JOB | LS |
13. | Bollards. | 6 | EA |
Alternate No. 1 Bid Schedule
STAIRWAY CANOPY BID SCHEDULE
| Item No. | Description | Estimated Quantity | Unit |
|---|---|---|---|
1. | New Canopy. This Includes All Labor, Materials and Equipment Necessary to Install the New Canopy as Described on the Construction Drawings. | JOB | LS |