Hamilton Road Sidewalk Stabilization

Project No:  47-19-15

Location:  Thornburg, Allegheny County, PA

Owner:  Borough of Thornburg

Manager:  Clint Reilly

Estimated Cost: 

BB No. 1 $200,000
BB No. 2:  $158,000
BB No. 3:  $50,000

 

ContractorContact PersonBid Amount
Borough of Thornburg
545 Hamilton
Pittsburgh, PA  15205
Kristina SzmulN/A
Ben Kramer Construction, Inc.
176 O’Neil Lane
Pittsburgh, PA  15237
Ben Kramer
W. A. Hoy Construction, Inc.
5882 Kennedy Avenue
Export, PA  15632
Tina Antolik
Holbein, Inc.
445 Mill Street
Freeport, PA  16229
Andrea Schriner
Kolton Construction
2840 Leechburg Road
Pittsburgh, PA  15239-1028
Brian Churilla
C H & D Enterprises, Inc.
100 Brady Place
New Stanton, PA  15672
Lyndsey Donohoe
Fryer Excavating, LLC
338 Concord Chruch Road
Beaver Falls, PA  15010
Ty Thellman
Independent Enterprises, Inc.
5020 Thompson Run Road
Oakdale, PA  15071
Blaine Popp
Liberty Fuel & Supply Company, Inc.
545 Forest Avenue
Carnegie, PA  15106
Jack Mackin
T. A. Gail, Inc.
353 Armstrong Road
Gibsonia, PA  15044
Ted Gail
Cronin Enterprises
667 US Route 30
Imperial, PA  15126
Dylan Croftcheck

 

Bid Advertisement

Sealed Bids are requested by the Borough of Thornburg.  Bids will be received by the Borough’s Consulting Engineer, NIRA Consulting Engineers, Inc. at 950 Fifth Avenue, Coraopolis, PA 15108, until 4:00 P.M. prevailing time, Friday, January 23, 2026, for the Hamilton Road Sidewalk Stabilization.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids.

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

All Bid Documents are available via email request to bids@niraengineers.com.  Electronic bid documents are available for a $25.00 fee and printed bid documents are available for a $100.00 fee with an additional charge of $15.00 when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Borough of Thornburg.  Only bids from Contractors who have obtained documents directly from NIRA Consulting Engineers, Inc. will be accepted at bid opening. 

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442.  The Prevailing Wage Scale is included in these Specifications.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

The work generally includes, but is not limited to, providing all supervision, labor, material and equipment required to complete the removal of existing concrete sidewalk, installation of a structurally designed concrete sidewalk, installation of block retaining wall, installation of storm sewers, and repaving Hamilton Road.

Bid Schedule

BASE BID NO. 1 – SIDEWALK CONSTRUCTION BID SCHEDULE

Item No.DescriptionEstimated
Quantity
Unit

1.1

Mobilization, Bonds, Insurances, Shop Drawings, and Photo Documentation.

JOB

LS

1.2

Maintenance and Protection of Traffic.

JOB

LS

1.3

Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, Erosion and Sedimentation Controls, and Clearing and Grubbing.

JOB

LS

1.4

Test Hole Excavation (As Directed).

5

EA

1.5

Miscellaneous Incidental Work.  Includes Landscaping, Removal and Reinstall Planters and All Other Disturbed Items, Clearing and Grubbing, and All Other Items Not Specified Herein.  Also Includes All Materials, Labor and Equipment to Complete.

JOB

LS

1.6

Construction Surveying.

JOB

LS

1.7

Demolish Existing Concrete Sidewalk and Curb (Depth of Existing Sidewalk Varies).

JOB

LS

1.8

Moment Slab Sidewalk and Curb with Toe Wall 5 Feet Below Sidewalk, Sta. 0+00 – 2+76 (Sidewalk Detail No. 1).

145

SY

1.9

Moment Slab Sidewalk and Curb with Toe Wall 4 Feet Below Sidewalk, Sta. 2+76 – 3+28 (Sidewalk Detail No. 1).

30

SY

1.10

Moment Slab Sidewalk and Curb with Toe Wall 3 Feet Below Sidewalk, Sta. 3+28 – 3+68 (Sidewalk Detail No. 1).

20

SY

1.11

Concrete Sidewalk with Integral Curb and Toe Wall 1 Foot Below Sidewalk.  Sta. 3+68 – 5+28 (Sidewalk Detail No. 2).

85

SY

1.12

Standard Concrete Sidewalk with Integral Curb, Sta. 5+28 – 6+52 (Sidewalk Detail No. 3).

80

SY

1.13

PennDOT No. 2A Aggregate Subbase and Fill Voids (6 Inch Depth for Sidewalks).

350

TON

1.14

Class 4, Type A Geotextile Fabric (Sidewalk Subbase).

360

SY

1.15

Abandon Existing Water Service Valve (Per PA American Water Requirements).

1

EA

1.16

Reconfigure Water Service to Park to Install Meter and Backflow Preventer Inside Sidewalk.  Includes Replacing Curb Box, Installation of Meter Pit with New Backflow Preventer, and Installation of Copper Service Line as Needed.

JOB

LS

1.17

4 Foot High Chainlink Fence. Includes Black PVC Coated Mesh and Post.  Also Includes All Appurtenances to Install Posts Mounted to Back of Concrete Toe Wall.

520

LF

1.18

12 Inch Diameter HDPE N-12 Storm Sewer Pipe, 0-6 Foot Depth.  Includes PennDOT No. 2A Stone Backfill in Paven Areas.

310

LF

1.19

Precast Concrete Inlet Box, Standard 2’x 4’ Inlet Box with Type C Top Unit, 0-6 Foot Depth.  Includes Frame and Grate.

2

EA

1.20

Core Hole and Connect New 12 Inch Storm Sewer Pipe to Existing Concrete Inlet Box.

1

EA

1.21

Cap Existing Storm Sewer Pipe.

1

EA

1.22

Fill Behind New Concrete Sidewalks/Toe Walls with 8 Inch Depth Clean Topsoil Compacted in Place.

JOB

LS

1.23

Superpave Asphalt Mixture Design WMA Binder Course, PG 64-22, 0.0 to 0.3 Million ESAL’s, 25mm Mix (6 Inch Depth).

75

SY

Bid Schedule

BASE BID NO. 2 – HILLSIDE STABILIZATION BID SCHEDULE

Item No.DescriptionEstimated
Quantity
Unit

2.1

Mobilization, Bonds, Insurances, Shop Drawings, and Photo Documentation.

JOB

LS

2.2

Maintenance and Protection of Traffic.

JOB

LS

2.3

Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, Erosion and Sedimentation Controls, and Clearing and Grubbing.

JOB

LS

2.4

Test Hole Excavation (As Directed).

2

EA

2.5

Miscellaneous Incidental Work.  Includes Landscaping, Removal and Reinstall Planters and All Other Disturbed Items, Clearing and Grubbing, and All Other Items Not Specified Herein.  Also Includes All Materials, Labor and Equipment to Complete.

JOB

LS

2.6

Construction Surveying.

JOB

LS

2.7

Demolish Existing Timber Retaining Walls.

JOB

LS

2.8

Novum Block Retaining Wall No. 1 (As Designed) Alpine Texture.

JOB

LS

2.9

Novum Block Retaining Wall Not 2 (As Designed) Alpine Texture.

JOB

LS

2.10

Novum Block Retaining Wall No. 3 (As Designed) Alpine Texture.

JOB

LS

2.11

Novum Block Retaining Wall No. 4 (As Designed) Alpine Texture.

JOB

LS

2.12

Acid Stain Block Retaining Walls to Mimic Natural Limestone with Multi Color Pallet (Colors As Approved by Owner).

JOB

LS

2.13

Relocate Existing Underground Electrical and Conduit As Necessary to Facilitate Wall Installation.

JOB

LS

2.14

6 Inch Perforated HDPE Underdrain Piping.

300

LF

2.15

Core Hole and Connect 6 Inch Underdrain Piping to Existing Inlet Box.

2

EA

2.16

Relocate Existing Basketball Hoop.  Install in 24 Inch Diameter Sonotube at a Depth of 48 Inches in Concrete.

JOB

LS

2.17

Reline Stripe Existing Basketball Court (Includes Removal of Existing Line Striping As Necessary).

JOB

LS

2.18

Asphalt Restoration of Tenis Court and Basketball Court (As Detailed).

100

SY

Bid Schedule

BASE BID NO. 3 – ROAD PAVING BID SCHEDULE

Item No.DescriptionEstimated
Quantity
Unit

3.1

Mobilization, Bonds, Insurances, Shop Drawings, and Photo Documentation.

JOB

LS

3.2

Maintenance and Protection of Traffic.

JOB

LS

3.3

Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, Erosion and Sedimentation Controls, and Clearing and Grubbing.

JOB

LS

3.4

Fill Behind New Asphalt and Wedge Curbing with Clean Topsoil.

JOB

LS

3.5

Mill Roadway to 1-1/2 Inch Depth (Milled Material to be Retained by Contractor).

1,510

SY

3.6

Mill Asphalt Surfaces to 3 Inch Depth in Base Repair Areas, As Directed (Milled Material to be Retained by Contractor).

305

SY

3.7

Superpave Asphalt Mixture Design WMA Leveling Course, PG 64-22, 0.0 to 0.3 Million ESAL’s, Fine Graded 9.5mm Mix, (Depth Varies).

95

TON

3.8

Superpave Asphalt Mixture Design WMA Wearing Course, PG 64-22, 0.0 to 0.3 Million ESAL’s, 9.5mm Mix, SRL-E (1-1/2 Inch Depth).

140

TON

3.9

Superpave Asphalt Mixture Design WMA Binder Course, PG 64-22, 0.0 to 0.3 Million ESAL’s, 25mm Mix, SRL-E (3 Inch Depth.  Base Repair As Directed).

55

TON

3.10

Grade Adjustment of Existing Miscellaneous Structures.

5

EA

NIRA Consulting Engineers, Inc.