Smith Lane Repaving
Project No: 47-39-15
Location: Thornburg, Allegheny County, PA
Owner: Borough of Thornburg
Manager: Clint Reilly
Estimated Cost: $90,000
Contractor | Contact Person | Bid Amount |
---|---|---|
Borough of Thornburg 545 Hamilton Road Pittsburgh, PA 15205 |
Kristina Szmul | N/A |
Bid Advertisement
Sealed Bids are requested by the Borough of Thornburg. Bids will be received by the Borough’s Consulting Engineer, NIRA Consulting Engineer, Inc. at 950 Fifth Avenue, Coraopolis, PA 15108 until 4:00 P.M. prevailing time, Wednesday, July 2, 2025 for the Smith Lane Repaving. Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids.
Interested parties may view the Profile and Bid Schedule for this Project on the internet at: www.niraengineers.com.
Copies of the Bid Documents may be examined at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $60.00. An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested. Checks are to be made payable to NIRA Consulting Engineers, Inc. All requests for documents via email should be sent to mail@niraengineers.com along with a copy of the signed check. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided. Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Borough of Thornburg. Only documents obtained directly from the Engineer will be valid at bid opening.
A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.
Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442. The Prevailing Wage Scale is included in these Specifications.
Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).
Adherence to Instructions to Bidders is required.
No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.
The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.
Project Scope
The work generally includes, but is not necessarily limited to, providing all supervision, labor, material and equipment required to complete the asphalt milling and resurfacing of Borough roads or portions thereof, as herein specified and/or directed by the Engineer or Owner.
Bid Schedule
Base Bid Schedule
Item No. | Description | Estimated Quantity |
Unit |
---|---|---|---|
1-203 | Class 1 Excavation, Includes Removal of Existing Asphalt Pavement and Subbase Material (Full Depth Base Repair Areas). | 40 | CY |
2-212 | Class 4 Geotextile Fabric (Full Depth Base Repair Areas). | 115 | SY |
3-413 | Superpave Asphalt Mixture Design WMA Wearing Course, PG 64-22, 0.0 to 0.3 Million ESAL’s, 9.5mm Mix, SRL-E (1-1/2 Inch Depth). | 265 | TON |
4-413 | Superpave Asphalt Mixture Design WMA Binder Course, PG 64-22, 0.0 to 0.3 Million ESAL’s, 25mm Mix (3 Inch Depth) (Base Repair, As Directed). | 40 | TON |
5-350 | 8 Inch Depth Coarse Aggregate Subbase (Full Depth Base Repair Areas). | 115 | SY |
6-491 | Mill Roadway to 1-1/2 Inch Depth (Milled Material to be Retained by Contractor). | 2,187 | SY |
7-491 | Milling of Asphalt Pavement Surfaces (3 Inch Depth) (Base Repair, As Directed) (Milled Material to be Retained by Contractor). | 220 | SY |
8-601 | 10 Inch Ductile Iron Pipe Storm Sewer. | 10 | LF |
9-606 | Grade Adjustment of Existing Miscellaneous Structures. | 5 | EA |
10-608 | Mobilization, Bonds, Insurances, and Shop Drawings. | JOB | LS |
11-703 | PennDOT No. 2A Coarse Limestone Aggregate Backfill Behind New Asphalt (As Directed) and Storm Pipe Backfill. | 30 | TON |
12-802 | Finish Grading, Topsoil, Seeding, and Mulching. Included Filling Behind New Asphalt with Topsoil, Seed, and Mulch. | JOB | LS |
13-901 | Maintenance and Protection of Traffic. | JOB | LS |
Bid Schedule
Base Bid Schedule – Yale Road Schedule
Item No. | Description | Estimated Quantity |
Unit |
---|---|---|---|
2-491 | Mill Roadway to 1-1/2 Inch Depth (Milled Material to be Retained by Contractor). | 99 | SY |
3-608 | Mobilization, Bonds, Insurances, and Shop Drawings. | JOB | LS |
4-802 | Finish Grading, Topsoil, Seeding and Mulching. Includes Filling Behind New Asphalt with Topsoil, Seed, and Mulch. | JOB | LS |
5-901 | Maintenance and Protection of Traffic. | JOB | LS |
NIRA Consulting Engineers, Inc.
950 Fifth Avenue, Coraopolis, PA 15108
412.262.3970