Steubenville Pike Waterline Replacement

Project No:  16-834-91

Location:  Robinson Township, Allegheny County, PA

Owner:  The Municipal Authority of the Township of Robinson

Manager:  Doug Evans

Estimated Cost:  $2,200,000

Addendum No. 1 Issued and Emailed January 28, 2026

Addendum No. 2 Issued and Emailed February 2, 2026

*Contract Awarded February 13, 2026

ContractorContact PersonBid Amount
The Municipal Authority of the Township of Robinson
4200 Campbells Run Road
Pittsburgh, PA  15205
Leo GismondiN/A
W. A. Petrakis Contracting, LLC
1501 Pontiac Court
Export, PA  15632
Joe UrbanN/A
Casper Colosimo & Son, Inc.
5170 Campbells Run Road
Pittsburgh, PA  15205
Greg LoPinto$2,563,145.00*
Fryer Excavating, Inc.
338 Concord Church Road
Beaver Falls, PA  15010
Mike EngleN/A
Rudzik Excavating, Inc.
401 Lowellville Road
P.O. Box 206
Struthers, OH  44471
Ryan BedlionN/A
S.E.T., Inc.
235 E. Water Street
Lowellville, OH  44436
Moussa BitterN/A
Wilson Excavating and Utility Construction, LLC
1807 Shenango Road
New Galilee, PA  16141
Nicole Natale$2,785,625.50
Alex E. Paris Contracting Company, Inc.
P.O. Box 369
1595 Smith Township State Road
Atlasburg, PA  15004-0369
Todd BogarN/A
Frank J. Zottola Construction, Inc.
595 Pittsburgh Road
Butler, PA  16002
Regan ThompsonN/A
C & R Directional Boring, LLC
15452 Rockton Mt. Highway
Clearfield, PA  16830
Heather CutlerN/A
Jet Jack, Inc.
5020 Thoms Run Road
Oakdale, PA  15071
Blaine Popp$2,988,137.50
Golden Triangle Construction, Inc.
8555 Old Steubenville Pike
Imperial, PA  15126
Michael Casciato$4,790,777.50
J.S. Bova Excavating, LLC
235 State Street
P.O. Box 296
Structhers, OH  44471
Cody BovaN/A
Niando Construction, Inc.
620 Long Road
Pittsburgh, PA  15235
Anthony MontaltoN/A
Cronin Enterprises Civil & Rail Division
667 Route 30
Imperial, PA  15126
Chandler Lawrence$2,667,161.82

 

Bid Advertisement

Sealed Bids are requested by the Municipal Authority of the Township of Robinson at 4200 Campbells Run Road, Pittsburgh, PA 15205 until 3:00 P.M. prevailing time, Thursday, February 5, 2026, for the Steubenville Pike Waterline Replacement.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids.

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

All Bid Documents are available via email request to bids@niraengineers.com.  Electronic bid documents are available for a $25.00 fee and printed bid documents are available for a $100.00 fee with an additional charge of $15.00 when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Municipal Authority of the Township of Robinson.  Only bids from Contractors who have obtained documents directly from NIRA Consulting Engineers, Inc. will be accepted at bid opening.

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442.  The Prevailing Wage Scale is included in these Specifications.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

The work generally consists of the installation of 4,735 linear feet of 12 inch PVC waterline, seven (7) fire hydrants, water main connections, gate valves, copper service lines and valves, and surface restoration.

Bid Schedule

Item No.DescriptionEstimated
Quantity
Unit

1.

Mobilization, Bonds, Insurances, Shop Drawings, and Photo Documentation.

JOB

LS

2.

Maintenance and Protection of Traffic.  Includes All Items Pertaining to the Approved PennDOT Highway Occupancy Permit and Restoration of Traffic Signal Vehicle Detection Wires.

JOB

LS

3.

Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, and Erosion and Sedimentation Controls.

JOB

LS

4.

Test Hole Excavation (As Directed).

15

EA

5.

Miscellaneous Incidental Work.  Includes Landscaping, Removal and Reinstall Fencing, Guide Rails, Walls and Planters, Clearing and Grubbing, and All Other Items Not Specified Herein.  Also Includes All Materials, Labor and Equipment to Complete.

JOB

LS

6.

Dechlorination of All Planned and Unplanned Discharges.

JOB

LS

7.

12 Inch C900 PVC Pipe and D.I. Fittings.

4,735

LF

8.

8 Inch C900 PVC Pipe and D.I. Fittings.

20

LF

9.

6 Inch C900 PVC Pipe and D.I. Fittings.

170

LF

10.

Polywrap Pipe Encasement (D.I. Fittings Only.  Size Varies).

4,925

LF

11.

12 Inch Mechanical Joint Restraint (Megalug PVC to MJ).

100

EA

12.

8 Inch Mechanical Joint Restraint (Megalug PVC to MJ).

10

EA

13.

6 Inch Mechanical Joint Restraint (Megalug PVC to MJ).

35

EA

14.

12 Inch External Bell Harness Joint Restraint.

235

EA

15.

8 Inch External Bell Harness Joint Restraint.

5

EA

16.

6 Inch External Bell Harness Joint Restraint.

8

EA

17.

12 Inch Resilient Wedge Gate Valve Box and Lid.

11

EA

18.

8 Inch Resilient Wedge Gate Valve Box and Lid.

1

EA

19.

6 Inch Resilient Wedge Gate Valve Box and Lid.

2

EA

20.

Remove Existing Fire Hydrant Assembly and Valve.

7

EA

21.

Steubenville Pike Waterline Connection

Sta. 0+00±.  As Detailed on the Construction Drawings and Technical Specifications or As Required by Actual Field Conditions.  Includes All Labor, Tools, Equipment and Temporary Materials to Complete As Described in the Measurement and Payment Section of the Technical Specifications.  Also Includes All Costs Associated with Working at Night.

JOB

LS

22.

Sunset Drive Waterline Connection

Sta. 10+10±.  As Detailed on the Construction Drawings and Technical Specifications or As Required by Actual Field Conditions.  Includes All Labor, Tools, Equipment and Temporary Materials to Complete As Described in the Measurement and Payment Section of the Technical Specifications.  Also Includes All Costs Associated with Working at Night.

JOB

LS

23.

Tidball Road Waterline Connection

Sta. 14+82±.  As Detailed on the Construction Drawings and Technical Specifications or As Required by Actual Field Conditions.  Includes All Labor, Tools, Equipment and Temporary Materials to Complete As Described in the Measurement and Payment Section of the Technical Specifications.  Also Includes All Costs Associated with Working at Night.

JOB

LS

24.

Waterford Drive Waterline Connection

Sta. 19+17±.  As Detailed on the Construction Drawings and Technical Specifications or As Required by Actual Field Conditions.  Includes All Labor, Tools, Equipment and Temporary Materials to Complete As Described in the Measurement and Payment Section of the Technical Specifications.  Also Includes All Costs Associated with Working at Night.

JOB

LS

25.

Midas Auto Waterline Connection

Sta. 42+42±.  As Detailed on the Construction Drawings and Technical Specifications or As Required by Actual Field Conditions.  Includes All Labor, Tools, Equipment and Temporary Materials to Complete As Described in the Measurement and Payment Section of the Technical Specifications.  Also Includes All Costs Associated with Working at Night.

JOB

LS

26.

Churchill Road Waterline Connection

Sta. 45+92±.  As Detailed on the Construction Drawings and Technical Specifications or As Required by Actual Field Conditions.  Includes All Labor, Tools, Equipment and Temporary Materials to Complete As Described in the Measurement and Payment Section of the Technical Specifications.  Also Includes All Costs Associated with Working at Night.

JOB

LS

27.

PennDOT Coarse Aggregate Limestone Backfill (In Pipe Trench and As Ordered By the Engineer).

2,800

CY

28.

3/4 Inch Corporation Valve and Service Saddle.

49

EA

29.

3/4 Inch Curb Valve, Box, and Lid.

49

EA

30.

3/4 Inch Type K Copper Tubing Service Line.

1,500

LF

31.

1 Inch Corporation Valve and Service Saddle.

7

EA

32.

1 Inch Curb Valve, Box and Lid.

7

EA

33.

1 Inch Type K Copper Tubing Service Line.

210

LF

34.

1-1/2 Inch Corporation Valve and Service Saddle.

1

EA

35.

1-1/2 Inch Curb Valve, Box, and Lid.

1

EA

36.

1-1/2 Inch Type K Copper Tubing Service Line.

30

LF

37.

2 Inch Corporation Valve and Service Saddle.

2

EA

38.

2 Inch Curb Valve, Box, and Lid.

2

EA

39.

2 Inch Type K Copper Tubing Service Line.

60

LF

40.

Fire Hydrant Assembly, Including 6 Inch Valve.

7

EA

41.

Abandon Existing Water Main Valve.

12

EA

42.

Tracer Wire.

4,925

LF

43.

Tracer Wire Test Station.

7

EA

44.

Tracer Wire Grounding Anode.

14

EA

45.

Tracer Wire Hydrant Access Box with Hydrant Flange.

7

EA

46.

Concrete Pipe Encasement.

10

CY

47.

Storm Sewer Piping Replacement:  (As Directed.  Includes AASHTO No. 57 Pipe Bedding, Depth Varies.)

 

 

 

a.      12 Inch HDPE N-12 Pipe

50

LF

 

b.      15 Inch HDPE N-12 Pipe

50

LF

 

c.      18 Inch HDPE N-12 Pipe

50

LF

 

d.      24 Inch HDPE N-12 Pipe

50

LF

48.

Temporary Asphalt Pavement (2 Inch Depth of 9.5mm Warm Mix Asphalt or H.E.S. Concrete Cap) (No Cold Patch).

1,700

SY

49.

Reinforced Concrete Slab Restoration.  Approximately 10 Inch Thick (As Detailed).

2,700

SY

50.

Superpave Asphalt Mixture Design WMA Wearing Course, PG 64-22, 0.3 to 3.0 Million ESAL’s, 9.5mm Mix, SRL-E (1-1/2 Inch Depth).

250

TON

51.

Superpave Asphalt Mixture Design WMA Binder Course, PG 64-22, 0.3 to 3.0 Million ESAL’s, 19mm Mix (Depth Varies).

580

TON

52.

Superpave Asphalt Mixture Design WMA Base Course, PG 64-22, 0.3 to 3.0 Million ESAL’s, 25mm Mix (Depth Varies).

830

TON

53.

1-1/2 Inch Milling and Overlay of State Road and Township Roads.  Includes 1-1/2 Inch Wearing Course (Milled Material to be Retained by Contractor).

6,800

SY

54.

Asphalt Driveway Restoration.

20

SY

55.

Concrete Driveway Restoration.

20

SY

56.

Gravel Driveway Restoration.

20

SY

57.

Concrete Sidewalk Restoration.

50

SY

58.

Plain Cement Concrete Curb.

100

LF

59.

Combination Concrete Curb and Gutter.

100

LF

60.

Waterborne Pavement Markings Restoration.

JOB

LS

61.

Snowplowable Raised Pavement Markers (RPMs) Reflective Device Restoration.

JOB

LS

62.

Flowable Backfill of Abandoned Pipes.

140

CY

NIRA Consulting Engineers, Inc.

950 Fifth Avenue, Coraopolis, PA 15108
412.262.3970

© 2025 NIRA Consulting Engineers, Inc.