Waterline Extension REBID

Project No:  G-1149-25 REBED

Location:  Avella, Washington County, PA

Owner:  Avella School District

Manager:  Clint Reilly

Estimated Cost:  Alt. 1 – $295,330  Alt. 2 – $238,828  Alt. 3 – $208,828

 *Corrected Figure

ContractorContact PersonBid Amount
Avella Area School District
1000 Avella Road
Avella, PA  15312
John GalvinN/A
Morgan Excavating, LP
15 Arentzen Blvd.  Upper Suite
Charleroi, PA  15022
April SchwalbN/A
Quigley Development, Inc.
103 Progress Lane
Canonsburg, PA  15317
Mike HandlowN/A
Alex E. Paris Contracting Company, Inc.
1595 Smith Township State Road (Route 18)
Atlasburg, PA  15004-0369
Todd BogarA1 $355,956.50
A2 $293,204.25*
A3 $280,124.85
3D Murin Construction
122 Naponic Lane
North Huntington, PA  15642
Eric BallashA1 $358,739.00
A2 $264,582.50
A3 $231,920.50
Fleeher Contracting, LLC
31 Woodcrest Drive
Cecil, PA  15321
BrandyN/A
Lindy Paving, Inc,.
1807 Shenango Road
New Gailee, PA  15141
Nicole NataleN/A
Jet Jack, Inc.
5020 Thoms Run Road
Oakdale, PA  15071
Blaine PoppA1 $354,720.00
A2 $274,747.50
A3 $251,160.50
Preferred Plumbing and Heating Solutions, LLC
246 Pittsburgh Grade Road
Hookstown, PA  15050
David DemorA1 $317,573.00
A2 $249,144.00
A3 $227,245.40
Verardi Landscapes, LLC
2156 Poor Richards Lane
Pittsburgh, PA  15237-4216
Nicholas VerardiA1 $633,584.00
A2 $528,691.50*
A3 $433,392.30*
N & N Landscaping, LLC
256 Gary Drive
Sewickley, PA  15143
Nate NusskernA1 $547,136.27*
A2 $405,278.39*
A3 $360,220.61*

 

Bid Advertisement

Sealed Bids are requested by the Avella Area School District at the Business Office located at 1000 Avella Road, Avella, PA 15312 until 4:00 P.M. prevailing time, Thursday, May 7, 2026 for the Waterline Extension Project Rebid.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids. 

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

All Bid Documents are available via email request to bids@niraengineers.com.  Electronic bid documents are available for a $25.00 fee and printed bid documents are available for a $75.00 fee with an additional charge of $15.00 when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Avella Area School District.  Only bids from Contractors who have obtained documents directly from NIRA Consulting Engineers, Inc. will be accepted at bid opening. 

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442.  The Prevailing Wage Scale is included in these Specifications.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

The successful Bidder on this work will be required to obtain security clearances consistent with PA Act 34, PA Act 151 and PA Act 114.

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

The work generally consists of the installation of 850 linear feet of 8 inch PVC waterline, 445 linear feet of 6 inch PVC waterline, 244 linear feet of 4 inch PVC waterline, one (1) fire hydrant, water meter vault, gate valves, interior building waterline connections, and surface restoration.  This Contract has been divided into three (3) separate Alternate Bids.

Alternate No. 1 Bid Schedule

WATERLINE EXTENSION TO BOTH SCHOOLS

Item No.DescriptionEstimated
Quantity
Unit
A1.1Mobilization, Bonds, Insurances, Shop Drawings, Photo Documentation.JOBLS
A1.2Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, and Erosion and Sedimentation Controls.JOBLS
A1.3Test Hole Excavation (As Directed).5EA
A1.4Miscellaneous Incidental Work.  Includes Landscaping, Removal and Reinstall Fencing, Guide Rails, Railings, Walls and Planters, Clearing and Grubbing, and All Other Items Not Specified Herein.  Also Includes All Materials, Labor and Equipment to Complete.JOBLS
A1.5Dechlorination of All Planned and Unplanned Discharges.JOBLS
A1.68 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).853LF
A1.76 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).445LF
A1.84 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).240LF
A1.9Polywrap Pipe Encasement (D.I. Fittings Only.  Size Varies).35LF
A1.108 Inch Mechanical Joint Restraint (Megalug).2EA
A1.116 Inch Mechanical Joint Restraint (Megalug).2EA
A1.124 Inch Mechanical Joint Restraint (Megalug).2EA
A1.138 Inch Resilient Wedge Gate Valve, Box and Lid.4EA
A1.146 Inch Resilient Wedge Gate Valve, Box and Lid.1EA
A1.154 Inch Resilient Wedge Gate Valve, Box and Lid.2EA
A1.16Remove Existing Fire Hydrant Assembly and Valve.1EA
A1.17Fire Hydrant Assembly.  Including 6 Inch Valve.1EA
A1.18Water Meter Vault.  Includes All Components, D.I.P., and Appurtenances (As Designed).JOBLS
A1.19Connect Waterline to PA American Pressure Reducing Station Waterline.JOBLS
A1.20Connections to Existing Jr./Sr. High School Interior Piping (As Designed).JOBLS
A1.21Connection to Existing Elementary School Interior Piping (As Designed).JOBLS
A1.22PennDOT No. 2A Coarse Aggregate Limestone Backfill (In Pipe Trench and As Ordered by the Engineer).75CY
A1.23AASHTO No. 67 Limestone Pipe Bedding (Only in Areas of Unsuitable Material).15CY
A1.24Tracer Wire.1,600LF
A1.25Tracer Wire Test Station.3EA
A1.26Tracer Wire Grounding Anode.4EA
A1.27Tracer Wire Hydrant Access Box with Hydrant Flange.1EA
A1.28Temporary Asphalt Pavement (2 Inch Depth of 9.5mm Warm Mix Asphalt).4TON
A1.29Asphalt Driveway Restoration.100SY
A1.30Concrete Sidewalk Restoration.65SY
A1.31Plain Cement Concrete Curb.60LF
A1.32Waterborne Pavement Markings Restoration (Restore Damaged Markings).JOBLS
A1.33Bollard.2EA

Alternate No. 2 Bid Schedule

WATERLINE EXTENSION TO JR./SR. HIGH SCHOOL

Item No.DescriptionEstimated
Quantity
Unit

A2.1

Mobilization, Bonds, Insurances, Shop Drawings, Photo Documentation.

JOB

LS

A2.2

Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, and Erosion and Sedimentation Controls.

JOB

LS

A2.3

Test Hole Excavation (As Directed).

3

EA

A2.4

Miscellaneous Incidental Work.  Includes Landscaping, Removal and Reinstall Fencing, Guide Rails, Railings, Walls and Planters, Clearing and Grubbing, and All Other Items Not Specified Herein.  Also Includes All Materials, Labor and Equipment to Complete.

JOB

LS

A2.5

Dechlorination of All Planned and Unplanned Discharges.

JOB

LS

A2.6

8 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).

520

LF

A2.7

6 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).

445

LF

A2.8

4 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).

90

LF

A2.9

Polywrap Pipe Encasement (D.I. Fittings Only.  Size Varies).

30

LF

A2.10

8 Inch Mechanical Joint Restraint (Megalug).

2

EA

A2.11

6 Inch Mechanical Joint Restraint (Megalug).

2

EA

A2.12

4 Inch Mechanical Joint Restraint (Megalug).

2

EA

A2.13

8 Inch Resilient Wedge Gate Valve, Box and Lid.

3

EA

A2.14

6 Inch Resilient Wedge Gate Valve, Box and Lid.

1

EA

A2.15

4 Inch Resilient Wedge Gate Valve, Box and Lid.

1

EA

A2.16

Remove Existing Fire Hydrant Assembly and Valve.

1

EA

A2.17

Fire Hydrant Assembly.  Including 6 Inch Valve.

1

EA

A2.18

Water Meter Vault.  Includes All Components, D.I.P., and Appurtenances (As Designed).

JOB

LS

A2.19

Connect Waterline to PA American Pressure Reducing Station Waterline.

JOB

LS

A2.20

Connections to Existing Jr./Sr. High School Interior Piping (As Designed).

JOB

LS

A2.21

PennDOT No. 2A Coarse Aggregate Limestone Backfill (In Pipe Trench and As Ordered by the Engineer).

65

CY

A2.22

AASHTO No. 67 Limestone Pipe Bedding (Only in Areas of Unsuitable Material).

15

CY

A2.23

Tracer Wire.

1,055

LF

A2.24

Tracer Wire Test Station.

3

EA

A2.25

Tracer Wire Grounding Anode.

4

EA

A2.26

Tracer Wire Hydrant Access Box with Hydrant Flange.

1

EA

A2.27

Temporary Asphalt Pavement (2 Inch Depth of 9.5mm Warm Mix Asphalt).

3

TON

A2.28

Asphalt Driveway Restoration.

60

SY

A2.29

Concrete Sidewalk Restoration.

65

SY

A2.30

Plain Cement Concrete Curb.

45

LF

A2.31

Waterborne Pavement Markings Restoration (Restore Damaged Markings).

JOB

LS

A2.32

Bollard.

2

EA

Alternate No. 3 Bid Schedule

WATERLINE EXTENSION TO ELEMENTARY SCHOOL

Item No.DescriptionEstimated
Quantity
Unit

A3.1

Mobilization, Bonds, Insurances, Shop Drawings, Photo Documentation.

JOB

LS

A3.2

Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, and Erosion and Sedimentation Controls.

JOB

LS

A3.3

Test Hole Excavation (As Directed).

3

EA

A3.4

Miscellaneous Incidental Work.  Includes Landscaping, Removal and Reinstall Fencing, Guide Rails, Railings, Walls and Planters, Clearing and Grubbing, and All Other Items Not Specified Herein.  Also Includes All Materials, Labor and Equipment to Complete.

JOB

LS

A3.5

Dechlorination of All Planned and Unplanned Discharges.

JOB

LS

A3.6

8 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).

881

LF

A3.7

4 Inch C906 HDPE DR-11 Pipe and HDPE Fittings (Installed by Thermal or Electro Fusion).

200

LF

A3.8

Polywrap Pipe Encasement (D.I. Fittings Only.  Size Varies).

15

LF

A3.9

8 Inch Mechanical Joint Restraint (Megalug).

2

EA

A3.10

4 Inch Mechanical Joint Restraint (Megalug).

2

EA

A3.11

8 Inch Resilient Wedge Gate Valve, Box and Lid.

2

EA

A3.12

4 Inch Resilient Wedge Gate Valve, Box and Lid.

1

EA

A3.13

Remove Existing Fire Hydrant Assembly and Valve.

1

EA

A3.14

Water Meter Vault.  Includes All Components, D.I.P., and Appurtenances (As Designed).

JOB

LS

A3.15

Connect Waterline to PA American Pressure Reducing Station Waterline.

JOB

LS

A3.16

Modification to Existing Jr./Sr. High School Interior Piping (As Designed).

JOB

LS

A3.17

Connection to Existing Elementary School Interior Piping (As Designed).

JOB

LS

A3.18

PennDOT No. 2A Coarse Aggregate Limestone Backfill (In Pipe Trench and As Ordered by the Engineer).

20

CY

A3.19

AASHTO No. 67 Limestone Pipe Bedding (Only in Areas of Unsuitable Material).

15

CY

A3.20

Tracer Wire.

1,081

LF

A3.21

Tracer Wire Test Station.

3

EA

A3.22

Tracer Wire Grounding Anode.

4

EA

A3.23

Temporary Asphalt Pavement (2 Inch Depth of 9.5mm Warm Mix Asphalt).

1

TON

A3.24

Asphalt Driveway Restoration.

20

SY

A3.25

Plain Cement Concrete Curb.

15

LF

NIRA Consulting Engineers, Inc.

950 Fifth Avenue, Coraopolis, PA 15108
412.262.3970

© 2026 NIRA Consulting Engineers, Inc.