2024 Sanitary Sewer Rehabilitations

Project No:  47-34-15

Location:  Borough of Thornburg, Allegheny County, PA

Owner:  Borough of Thornburg

Manager:  Clint Reilly

Estimated Cost:  $231,000

 

Contractor Contact Person Bid Amount
Borough of Thornburg
545 Hamilton Road
Pittsburgh, PA  15205
Dorothy Falk N/A
Insituform Technologies, Inc.
450 Imperial Industrial Park Drive
Oakdale, PA  15071
Cheryl Paulin $284,553.00
Insight Pipe Contracting, LLC
232 E. Lancaster Road
Harmony, PA  16037
Cindy Fernandez $217,202.00
Jet Jack, Inc.
5020 Thompson Run Road
Oakdale, PA  15071
Blaine Popp $220,367.00
SAK  Construction
864 Hoff Road
O’Fallon, MO  63366
Kathy Kreed N/A
Advanced Pipe Technologies, Inc.
4740 Streets Run Road
Pittsburgh, PA  15236
Derek Offutt N/A
Wilson – A Lindy Company
407 E. Neshannock Avenue
New Wilmington, PA  15142
Tyler Freyermuth $413,604.00
Snyder Environmental Services, Inc.
270 Industrial Blvd.
Kearneysville, WV  25430
Emily McFarland $265,426.00

 

Bid Advertisement

Sealed Bids are requested by the Borough of Thornburg.  Bids will be received by the Borough’s Consulting Engineer, NIRA Consulting Engineers, Inc. at 950 Fifth Avenue, Coraopolis, PA 15108  until 4:00 P.M. prevailing time, Thursday, August 1, 2024 for the 2024 Sanitary Sewer Rehabilitations.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids. 

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

Copies of the Bid Documents may be examined at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $75.00.  An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Borough of Thornburg.  Only documents obtained directly from the Engineer will be valid at bid opening. 

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442.  The Prevailing Wage Scale is included in these Specifications.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

The project generally includes the cured-in-place pipe (CIPP) lining of approximately 3,333 linear feet of 8 inch sanitary sewer pipe, 126 linear feet of 6 inch sanitary sewer pipe, 149 linear feet of 10 inch sanitary sewer pipe, 266 linear feet of 12 inch sanitary sewer pipe, service lateral, cut-outs, hydrophylic waterstop at manholes, precast concrete manhole installations, bypass pumping of sewage flows, traffic control and surface restoration.

Bid Schedule

Item No. Description Estimated
Quantity
Unit

1.

Mobilization, Bonds, Insurances, and Shop Drawings.

JOB

LS

2.

Bypass Pumping of Sewage Flows.

JOB

LS

3.

Maintenance and Protection of Traffic.

JOB

LS

4.

Coordinate Work with Borough of Thornburg and Residents.

JOB

LS

5.

Miscellaneous Incidental Work.  Includes Test Holes, Removal and Reinstall Landscaping, Fencing, Guide Rails, Sheds, Walls, Steps, Walkways, and Planters, Replacement of Ornamental Trees and Shrubs, and All Other Items Not Specified Herein.  Includes All Materials, Labor, and Equipment to Complete.

JOB

LS

6.

Finish Grading, Topsoil Placement, Seeding and Mulching, and Erosion and Sedimentation Control of Disturbed Areas.

JOB

LS

7.

6 Inch Cured-In-Place (CIPP).  Includes Cleaning, Root Removal, Pre and Post Lining CCTV Inspections, and Hydrophylic Waterstops at All Manholes.

126

LF

8.

8 Inch Cured-In-Place (CIPP).  Includes Cleaning, Root Removal, Pre and Post Lining CCTV Inspections, and Hydrophylic Waterstops at All Manholes.

3,333

LF

9.

10 Inch Cured-In-Place (CIPP).  Includes Cleaning, Root Removal, Pre and Post Lining CCTV Inspections, and Hydrophylic Waterstops at All Manholes.

149

LF

10.

12 Inch Cured-In-Place (CIPP).  Includes Cleaning, Root Removal, Pre and Post Lining CCTV Inspections, and Hydrophylic Waterstops at All Manholes.

266

LF

11.

Service Lateral Cut-Outs.

39

EA

12.

Heavy Cleaning to Remove Hard Material From 8 Inch Sanitary Sewer Pipe (MH 856-1329 to MH 856-1330).

39

LF

13.

Precast 48 Inch Diameter Manhole, Up to 8 Ft. Depth.  Includes All Pipe Connections and Frame and Cover. (Complete in Place)

4

EA

14.

Extra Depth of 48 Inch Diameter Precast Concrete Manhole.  (As Required)

3.00

VF

15.

Asphalt Borough Road Restoration.  (As Required)

10

SY

16.

PennDOT No. 2A Limestone Backfill. (As Required)

20

TON

NIRA Consulting Engineers, Inc.

950 Fifth Avenue, Coraopolis, PA 15108
412.262.3970