2025 Sewer Cleaning and Televising

Project No:  12-499-79

Location:  McKees Rocks, Allegheny County, PA

Owner:  Borough of McKees Rocks

Manager:  Doug Evans

Estimated Cost:  $90,000

 

Contractor Contact Person Bid Amount
Borough of McKees Rocks
340 Bell Avenue
McKees Rocks, PA  15136
LeeAnn Wozniak N/A
Robinson Pipe Cleaning
2656 Idlewood Road
Pittsburgh, PA  15205
Nathan Hill
State Pipe Services, Inc.
7587 Franklin Road
Cranberry Township, PA  16066
Tom Morris
Insight Pipe Contracting, LLC – A Piris Company
232 E. Lancaster Road
Harmony, PA  16037
Justing Keene
Go4 Hydrovac, LLC
190 Seanor Road
Irwin, PA  15642
Kimberly Scott

 

Bid Advertisement

Sealed Bids are requested by the Borough of McKees Rocks  at 340 Bell Avenue, McKees Rocks, PA 15136 until 3:00 P.M. prevailing time, Thursday, May 1, 2025 for the 2025 Sewer Cleaning and Televising.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids. 

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

Copies of the Bid Documents may be examined at the office of the Borough of McKees Rocks or at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $90.00.  An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Borough of McKees Rocks.  Only documents obtained directly from the Engineer will be valid at bid opening. 

A Performance Bond and Labor and Material Payment Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

The work generally consists of all labor, equipment, and supervision required to perform cleaning and closed circuit televising of approximately 17,200 LF of 6 inch to 72 inch diameter combined sanitary sewer pipe, as shown on the accompanying maps.  Contractor shall be responsible for providing source of water.  Work shall also include proper disposal of debris and submission of inspection documents.

Bid Schedule

Item No. Description Estimated
Quantity
Unit
1. Mobilization, Insurances and Bonds. JOB LS
2. Light Cleaning and Televising of Sanitary Sewers.    
  a.     6 Inch Diameter. 0 LF
  b.     8 Inch Diameter. 1,450 LF
  c.      10 Inch Diameter. 85 LF
  d.     12 Inch Diameter. 3,392 LF
  e.     15 Inch Diameter. 1,437 LF
  f.      18/20 Inch Diameter. 379 LF
  g.     24 Inch Diameter. 291 LF
  h.     48 Inch Diameter. 0 LF
  i.       72 Inch Diameter. 1,570 LF
3. Heavy Cleaning and Televising of Sanitary Sewers.    
  a.     6 Inch Diameter. 96 LF
  b.     8 Inch Diameter. 414 LF
  c.      10 Inch Diameter. 0 LF
  d.     12 Inch Diameter. 969 LF
  e.     15 Inch Diameter. 411 LF
  f.      18/20 Inch Diameter. 162 LF
  g.     24 Inch Diameter. 125 LF
  h.     48 Inch Diameter. 96 LF
  i.       72 Inch Diameter. 0 LF
4. Extra Heavy Cleaning and Televising of Sanitary Sewers.    
  a.     6 Inch Diameter. 0 LF
  b.     8 Inch Diameter. 207 LF
  c.      10 Inch Diameter. 0 LF
  d.     12 Inch Diameter. 485 LF
  e.     15 Inch Diameter. 205 LF
  f.      18/20 Inch Diameter. 0 LF
  g.     24 Inch Diameter. 0 LF
  h.     48 Inch Diameter. 0 LF
  i.       72 Inch Diameter. 0 LF
5. Special Cleaning Area    
  a.     8 Inch Diameter. 217 LF
  b.     12 Inch Diameter. 227  
  c.      15 Inch Diameter. 1,051 LF
  d.     18/20 Inch Diameter. 558 LF
  e.     24 Inch Diameter. 1,922 LF
  f.      30 Inch Diameter. 236 LF
  g.     36 Inch Diameter. 1,029 LF
6. Flow Management for 72 Inch Pipe (As Needed). 1,570 LF
7. Manhole Heavy Cleaning (As Directed). 5 EA
8. Catch Basin Cleaning. 25 EA
9. Root Cutting (As Directed). 5 EA
10. Cut Back Protruding Lateral (As Directed). 5 EA
11. Locate and Mark Manhole (As Directed). 5 EA
12. Provision of Reports and DVD’s. JOB LS
NOTES: 1.     Light Cleaning, Heavy Cleaning, and Extra Heavy Cleaning Costs are Independent of Each Other.  DO NOT Do an Add-On Type Cost.    
  2.     For Items with a Zero (0) Quantity, Provide a Unit Cost in the Event That it is Field Determined to be Required.  All Units and Cleaning Types are Estimated Based on Known Information. However, Different Levels of Cleaning May be Determined to be Required.    
NIRA Consulting Engineers, Inc.

950 Fifth Avenue, Coraopolis, PA 15108
412.262.3970

© 2025 NIRA Consulting Engineers, Inc.