Adeline Brown Avenue Waterline Relocation

Project No:  37-152-97

Location:  Oakmont Borough

Owner:  Oakmont Water Authority

Manager:  James A. Nordquist

Estimated Cost:  $135,000

 *Corrected Figure

Contractor Contact Person Bid Amount
Oakmont Water Authority
P.O. Box 73
721 Allegheny Avenue
Oakmont, PA  15139
James McCaskey N/A
Dunrite Construction & Paving, LLC
1151 Oaklake Road
Lower Burrell, PA  15068
Haley Tady $139,892.00
M. O’Herron Company
4002 Lorigan Street
Pittsburgh, PA  15224
Tawnya Sweeney N/A
Tedesco Construction Company
1107 Long Run Road
White Oak, PA  15131
Jon Tedesco N/A
Hiles Excavating, LC
170 Bish Road
Chicora, PA  16025
Rachel Altman N/A
Williams Excavation, LLC
6025 Schafer Drive
New Kensington, PA  15068
Dayne Williams $125,150.00
Superior Utility Excavating, Inc.
1149 Beaver Run Road
Greensburg, PA  15601
Corrie Houp N/A
Grit Industries, LLC
17695 Route 286
Saltsburg, PA  15681
Charlene Boney N/A
Jet Jack, Inc.
5020 Thoms Run Road
Oakdale, PA  15071
Blaine Popp $137,650.00
A. Folino Construction, Inc.
109 Dark Hollow Road
Oakmont, PA  15139
Jessica Gazzo $198,600.00
W. A. Petrakis Contracting, LLC
1501 Pontiac Court
Export, PA  15632
Joe Urban N/A
Frank J. Zottola Construction, Inc.
595 Pittsburgh Road
Butler, PA  16002
Regan Thompson N/A
W. A. Petrakis Contracting, LLC
1501 Pontiac Court
Export, PA  15632
Joe Urban N/A
Frank J. Zottola Construction, Inc.
595 Pittsburgh Road
Butler, PA  16002
Regan Thompson N/A
S.E.T., Inc.
235 East Water Street, Ste. C
Lowellville, OH  44436
Lindsey Sherrod $197,359.36
Strnisha Excavation, Inc.
109 Veronica Drive
Canonsburg, PA  15317
Carol Strnish N/A
CH&N Site Construction, Inc.
P.O. Box 6456
Lancaster, PA  17607-6456
Matt Eshelman $207,642.44
W. Construction Corporation
204 Laura Court
Jeannette, PA  15644
Nick Weaver $208,360.00*

 

Bid Advertisement

Sealed Bids are requested by the Oakmont Water Authority  at  P.O. Box 73, 721 Allegheny Avenue, Oakmont, PA  15139 until 10:00 A.M. prevailing time, Thursday, December 12, 2024, for the Adeline Brown Avenue Waterline Relocation.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids.

A mandatory prebid meeting will be held at 10:00 A.M. on Thursday, December 5, 2024 at the Oakmont Water Authority office.

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

Copies of the Bid Documents may be examined at the office of the Oakmont Water Authority or at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $75.00.  An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Oakmont Water Authority.  Only documents obtained directly from the Engineer will be valid at bid opening.

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442.  The Prevailing Wage Scale is included in these Specifications.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

This project generally consists of replacement of an existing potable water main and appurtenances along Adeline Brown Avenue in Oakmont Borough in Allegheny County, PA.  Work shall include, but not necessarily be limited to; provision and installation of all required pipe, fittings, restraints, thrust blocking, valves, testing of newly installed water lines, restoration of all disturbed areas including public roads and shoulders as needed and per the applicable Details and Sections, and all other items of work necessary to provide a complete project according to the Drawing and Specifications.

Bid Schedule

Item No. Description Estimated
Quantity
Unit

1.

Mobilization, Bonds, Insurances, Shop Drawings, and Photo Documentation.

JOB

LS

2.

Maintenance and Protection of Traffic.

JOB

LS

3.

Test Hole Excavation (As Directed).

2

EA

4.

12 Inch C900 PVC (DR-14) Pipe.  Includes All Sawcutting, Excavation, Bedding, Installation, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

480

LF

5.

8 Inch C900 PVC (DR-14) Pipe.  Includes All Sawcutting, Excavation, Bedding, Installation, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

7

LF

6.

12 Inch Wye, MJ, DI.  Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

1

EA

7.

12”x8” Tee, MJ, DI.  Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

1

EA

8.

12 Inch Solid Plug, MJ, DI. Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

3

EA

9.

12 Inch 45⁰ Bend, MJ, DI.  Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

1

EA

10.

12 Inch Gate Valve, MJ, DI.  Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

1

EA

11.

12 Inch Mechanical Joint Restraint (Megalug PVC to MJ).  Complete In Place.

4

EA

12.

8 Inch Mechanical Joint Restraint (Megalug PVC to MJ).  Complete In Place.

1

EA

13.

PennDOT No. 2A Coarse Aggregate Limestone Backfill (In Pipe Trench and As Ordered by the Engineer).

275

CY

14.

Temporary Blow-Off Assembly.  Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing.  Complete In Place.

2

EA

15.

Temporary Asphalt Pavement (2 Inch Depth of 9.5mm Warm Mix).

20

TON

16.

25mm Asphalt Base Course State Road Trench Pavement Restoration (As Detailed).