Adeline Brown Avenue Waterline Relocation
Project No: 37-152-97
Location: Oakmont Borough
Owner: Oakmont Water Authority
Manager: James A. Nordquist
Estimated Cost: $135,000
*Corrected Figure
Contractor | Contact Person | Bid Amount |
---|---|---|
Oakmont Water Authority P.O. Box 73 721 Allegheny Avenue Oakmont, PA 15139 |
James McCaskey | N/A |
Dunrite Construction & Paving, LLC 1151 Oaklake Road Lower Burrell, PA 15068 |
Haley Tady | $139,892.00 |
M. O’Herron Company 4002 Lorigan Street Pittsburgh, PA 15224 |
Tawnya Sweeney | N/A |
Tedesco Construction Company 1107 Long Run Road White Oak, PA 15131 |
Jon Tedesco | N/A |
Hiles Excavating, LC 170 Bish Road Chicora, PA 16025 |
Rachel Altman | N/A |
Williams Excavation, LLC 6025 Schafer Drive New Kensington, PA 15068 |
Dayne Williams | $125,150.00 |
Superior Utility Excavating, Inc. 1149 Beaver Run Road Greensburg, PA 15601 |
Corrie Houp | N/A |
Grit Industries, LLC 17695 Route 286 Saltsburg, PA 15681 |
Charlene Boney | N/A |
Jet Jack, Inc. 5020 Thoms Run Road Oakdale, PA 15071 |
Blaine Popp | $137,650.00 |
A. Folino Construction, Inc. 109 Dark Hollow Road Oakmont, PA 15139 |
Jessica Gazzo | $198,600.00 |
W. A. Petrakis Contracting, LLC 1501 Pontiac Court Export, PA 15632 |
Joe Urban | N/A |
Frank J. Zottola Construction, Inc. 595 Pittsburgh Road Butler, PA 16002 |
Regan Thompson | N/A |
W. A. Petrakis Contracting, LLC 1501 Pontiac Court Export, PA 15632 |
Joe Urban | N/A |
Frank J. Zottola Construction, Inc. 595 Pittsburgh Road Butler, PA 16002 |
Regan Thompson | N/A |
S.E.T., Inc. 235 East Water Street, Ste. C Lowellville, OH 44436 |
Lindsey Sherrod | $197,359.36 |
Strnisha Excavation, Inc. 109 Veronica Drive Canonsburg, PA 15317 |
Carol Strnish | N/A |
CH&N Site Construction, Inc. P.O. Box 6456 Lancaster, PA 17607-6456 |
Matt Eshelman | $207,642.44 |
W. Construction Corporation 204 Laura Court Jeannette, PA 15644 |
Nick Weaver | $208,360.00* |
Bid Advertisement
Sealed Bids are requested by the Oakmont Water Authority at P.O. Box 73, 721 Allegheny Avenue, Oakmont, PA 15139 until 10:00 A.M. prevailing time, Thursday, December 12, 2024, for the Adeline Brown Avenue Waterline Relocation. Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids.
A mandatory prebid meeting will be held at 10:00 A.M. on Thursday, December 5, 2024 at the Oakmont Water Authority office.
Interested parties may view the Profile and Bid Schedule for this Project on the internet at: www.niraengineers.com.
Copies of the Bid Documents may be examined at the office of the Oakmont Water Authority or at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $75.00. An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested. Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided. Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Oakmont Water Authority. Only documents obtained directly from the Engineer will be valid at bid opening.
A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.
Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442. The Prevailing Wage Scale is included in these Specifications.
Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).
Adherence to Instructions to Bidders is required.
No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.
The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.
Project Scope
This project generally consists of replacement of an existing potable water main and appurtenances along Adeline Brown Avenue in Oakmont Borough in Allegheny County, PA. Work shall include, but not necessarily be limited to; provision and installation of all required pipe, fittings, restraints, thrust blocking, valves, testing of newly installed water lines, restoration of all disturbed areas including public roads and shoulders as needed and per the applicable Details and Sections, and all other items of work necessary to provide a complete project according to the Drawing and Specifications.
Bid Schedule
Item No. | Description | Estimated Quantity |
Unit |
---|---|---|---|
1. |
Mobilization, Bonds, Insurances, Shop Drawings, and Photo Documentation. |
JOB |
LS |
2. |
Maintenance and Protection of Traffic. |
JOB |
LS |
3. |
Test Hole Excavation (As Directed). |
2 |
EA |
4. |
12 Inch C900 PVC (DR-14) Pipe. Includes All Sawcutting, Excavation, Bedding, Installation, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
480 |
LF |
5. |
8 Inch C900 PVC (DR-14) Pipe. Includes All Sawcutting, Excavation, Bedding, Installation, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
7 |
LF |
6. |
12 Inch Wye, MJ, DI. Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
1 |
EA |
7. |
12”x8” Tee, MJ, DI. Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
1 |
EA |
8. |
12 Inch Solid Plug, MJ, DI. Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
3 |
EA |
9. |
12 Inch 45⁰ Bend, MJ, DI. Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
1 |
EA |
10. |
12 Inch Gate Valve, MJ, DI. Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
1 |
EA |
11. |
12 Inch Mechanical Joint Restraint (Megalug PVC to MJ). Complete In Place. |
4 |
EA |
12. |
8 Inch Mechanical Joint Restraint (Megalug PVC to MJ). Complete In Place. |
1 |
EA |
13. |
PennDOT No. 2A Coarse Aggregate Limestone Backfill (In Pipe Trench and As Ordered by the Engineer). |
275 |
CY |
14. |
Temporary Blow-Off Assembly. Includes All Sawcutting, Excavation, Bedding, Installation, Polywrap, Initial Select Backfill to 1 VF Above Top of Pipe, Warning Tape, Tracer Wire System, and Testing. Complete In Place. |
2 |
EA |
15. |
Temporary Asphalt Pavement (2 Inch Depth of 9.5mm Warm Mix). |
20 |
TON |
16. |
25mm Asphalt Base Course State Road Trench Pavement Restoration (As Detailed). |
130 |
TON |