Project Title

Project No:  16-786-91

Location:  Robinson Township, Allegheny County, PA

Owner:  The Municipal Authority of the Township of Robinson

Manager:  Doug Evans

Estimated Cost:  $170,000

 

*Contract Awarded February 15, 2024

 

Contractor Contact Person Bid Amount
The Municipal Authority of the Township of Robinson
4200 Campbells Run Road
Pittsburgh, PA  15205
Leo Gismondi N/A
Jet Jack, Inc.
5020 Thoms Run Road
Oakdale, PA  15071
Blaine Popp $169,215.00
Lone Pine Construction
83 Lusk Road
Bentleyville, PA  15314
Dara O’Savage $215,610.00
Wilson Excavating
407 E. Neshannock Avenue
New Wilmington, PA  16142
Brandon Kish N/A
Hogen’s Heroes, Inc.
11 Mingo Creek Road
Eighty Four, PA  15330
John Subrick $265,790.00
Demex, LLC
125 Pflugh Road
Butler, PA  16001
George Stewart N/A
Stefanik’s Next Generation
2267 Todd Road
Aliquippa, PA  15001
JJ Stefanik N/A
S.E.T., Inc.
235 East Water Street
Lowellville, OH  44436
Lindsey Sherrod $245,958.21
J.S. Bova Excavating, LLC
235 State Street
P.O. Box 296
Struthers, OH  44471
Mason McKinley N/A
Quigley Development, Inc.
211 Lesnett Road
Pittsburgh, PA 15241
Michael Handlow N/A
W. A. Petrakis
1501 Pontiac Court
Export, PA  15632
Joe Urban $187,525.00*
Preferred Plumbing
246 Pittsburgh Grade Road
Hookstown, PA 15050
David Demor N/A

Bid Advertisement

Sealed Bids are requested by the Municipal Authority of the Township of Robinson at 4200 Campbells Run Road, Pittsburgh, PA 15205 until 3:00 P.M. prevailing time, Thursday, February 8, 2024 for the Chartiers Pump Station Waterline Replacement.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids. 

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

Copies of the Bid Documents may be examined at the office of the Municipal Authority of the Township of Robinson or at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $75.00.  An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Municipal Authority of the Township of Robinson.  Only documents obtained directly from the Engineer will be valid at bid opening. 

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442.  The Prevailing Wage Scale is included in these Specifications.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

The work generally includes the installation of approximately 800 linear feet of 2 inch HDPE waterline, removal of existing connection, and surface restoration.

Bid Schedule

Item No. Description Estimated
Quantity
Unit
1. Mobilization, Bonds, Insurances, Shop Drawings, Photo Documentation, Construction Layout/Surveying (Stake-Out and As-Built Survey). JOB LS
2. Coordinate Work with Property Owners and the Authority. JOB LS
3. Maintenance and Protection of Traffic. JOB LS
4. Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, Fertilizer, and Erosion and Sedimentation Controls. JOB LS
5. Test Hole Excavation (As Directed). 2 EA
6. Miscellaneous Incidental Work  Includes Landscaping, Removal and Reinstall Fencing, Guide Rails, Walls, and Planters, Clearing and Grubbing and All Other Items Not Specified Herein.  Includes All Materials, Labor and Equipment to Complete. JOB LS
7. Dechlorination of All Planned and Unplanned Discharges. JOB LS
8. 8 Inch D.I. Pipe and Fittings. 6 LF
9. 8 Inch Mechanical Joint Restraint. 5 EA
10. Polywrap Pipe Encasement (D.I. Fittings Only). 10 LF
11.

Existing Water Service Line Disconnection

As Detailed on the Construction Drawings and Technical Specifications or As Required by Actual Field Conditions.  Includes All Labor, Tools, Equipment, and Temporary Materials to Complete As Described in the Measurement and Payment Section of the Technical Specification.  Also Includes All Costs Associated with Working at Night.

JOB LS

12.

 

2 Inch Type ‘K’ Copper Tubing Water Service Line.  Continuous Roll, 370 psi Pipe (Complete In Place). 30 LF
13.

Directional Drill Water Service.  Includes 2 Inch DR-9 CTS HDPE Water Service Line Pipe and Fittings.  Continuous Roll, Butt-Fused, 250 psi Pipe.  (Complete In Place)

605 LF
14. 2 Inch DR-9 CTS HDPE Water Service Line Pipe and Fittings.  Installed By Open-Cut Excavation, Continuous Roll, Butt-Fused, 250 psi Pipe (Complete In Place). 169

LF

 

 

 

15. 4 Inch DR-9 CTS HDPE Water Service Line Pipe and Fittings.  Continuous Roll, Butt-Fused, 250 psi Pipe (Complete In Place). 5 LF
16. 2 Inch Corporation Valve and Service Saddle. 1 EA
17. 2 Inch Curb Valve, Box and S.S. Curb Box Rod. 1 EA
18. Connect to Exiting 4 Inch D.I. Water Service Line.  Includes Restrained Coupling and All Labor, Equipment and Materials to Complete Connection and Install. 1 EA
19. Pressure Reducing and Pressure Relief Valve Vault.  Includes All Valves, Pipe, Fittings, Concrete Vault, Pipe Supports, Pipe Seals, Sumps, Steps, Frame and Casting, and All Other Items Included In the Vault As Detailed and As Required. JOB LS
20. Air Release and Vacuum Valve Manhole.  Includes All Valves, Pipe, Fittings, Concrete Manhole, Pipe Supports, Pipe Seals, Sumps, Steps, Frame and Casting, and All Other Items Included in the Manhole As Detailed and As Required. JOB LS
21. Fill Abandoned 4 Inch Water Service Line with Flowable Backfill, Type C. 3.0 CY
22. PennDOT No. 2A Coarse Aggregate Limestone Backfill (In Pipe Trench and As Ordered by the Engineer). 365 CY
23. Tracer Wire. 800 LF
24. Tracer Wire Test Station. 2 EA
25. Tracer Wire Grounding Anode. 2 EA
26. Temporary Asphalt Pavement (2 Inch Depth of 9.5mm Warm Mix). 20 TON
27. Asphalt Trench Pavement Restoration (As Detailed). 500 SY