Greenhill Sanitary Sewer Rehabilitations

Project No:  41-95-09

Location:  Allegheny County, PA

Owner:  Girty’s Run Joint Sewer Authority

Manager:  Emile S. Ketterer

 

 

Contractor Contact Person Bid Amount
Girty’s Run Joint Sewer Authority
2236 Babcock Boulevard
Pittsburgh, PA  15237
Chris Kephart N/A
Insight Pipe Contracting
232 E. Lancaster Road
Harmony, PA 16037
Francis McCollough $382,444.00
Insituform Technologies, LLC
3014 US Hwy 301 North, Suite 700
Tampa, FL 33619
Chris Hulse $449,683.00
Jet Jack, Inc.
5020 Thoms Run Road
Oakdale, PA 15071
Blaine Popp $377,916.00
Wilson – A Lindy Company
407 E. Neshannock Avenue
New Wilmington, PA 16142
Tyler Freyermuth $589,138.00
Advanced Pipe Technologies, Inc.
4740 Streets Run Road
Pittsburgh, PA 15236
Derek Offutt $467,134.00

 

 

Bid Advertisement

Sealed Bids are requested by the Girty’s Run Joint Sewer Authority at the 2236 Babcock Boulevard, Pittsburgh, PA  15237 until 10:00 A.M. prevailing time, Tuesday, May 7, 2024 for Greenhill Sanitary Sewer Rehabilitations.  Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids.

Interested parties may view the Profile and Bid Schedule for this Project on the internet at:  www.niraengineers.com.

Copies of the Bid Documents may be examined at the office of the Girty’s Run Joint Sewer Authority or at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $75.00.  An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested.  Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided.  Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Girty’s Run Joint Sewer Authority.  Only documents obtained directly from the Engineer will be valid at bid opening.

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442.  The Prevailing Wage Scale is included in these Specifications.

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).

Adherence to Instructions to Bidders is required.

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.

Project Scope

The project generally includes the cured-in-place (CIPP) lining of approximately 7,868  linear feet of existing 8 inch sanitary sewer pipe, service lateral cut-outs, hydrophylic waterstop at manholes, manhole rehabilitations, bypass pumping of sewage flows, and traffic control.

Bid Schedule

Item No. Description Estimated
Quantity
Unit

1.

Mobilization, Bonds, Insurances, and Shop Drawings.

JOB

LS

2.

Bypass Pumping of Sewage Flows.

JOB

LS

3.

Maintenance and Protection of Traffic.

JOB

LS

4.

Coordinate Work with Girty’s Run Joint Sewer Authority, Residents, and Businesses.

JOB

LS

5.

8 Inch Cured-In-Place (CIPP).  Includes Cleaning, Root Removal, and Pre and Post Lining CCTV Inspections.

7,868

LF

6.

Hydrophilic Waterstops at Manholes (Required at All Manholes).

92

EA

7.

Service Lateral Cut-Outs.

150

EA

8.

Cut Back Intruding Break-In Connections.

22

EA

9.

Modular Manhole Invert Installation.  Includes, Removing Existing Manhole Invert and Apron, Surface Preparation, and Pouring and Reforming Invert and Apron.

7

EA

10.

Rehabilitate Existing Manhole.  Includes, Surface Preparation, Patching Mix (As Required), Infiltration Control Mix (As Required) and Liner Material.

5

VF

11.

Install Inside Drop Manhole Assembly (As Detailed).

12

VF

12.

Replace/Install Manhole Steps.

58

EA