Martins Way Water Tank and PRV Vault Modification
Project No:
19-235-86
Location:
Ambridge, Beaver County, Pennsylvania
Owner:
Borough of Ambridge Water Authority
Manager(s):
James A. Nordquist
Estimated Cost:
$400,000
*Addendum No. 1 Issued, Emailed and Mailed July 11, 2023
**Addendum No. 2 Issued and Emailed August 10, 2023
**Contract Awarded August 16, 2023
Contractor | Contact Person | Bid Amount |
---|---|---|
Borough of Ambridge Water Authority 600 11th Street Ambridge, PA 15003 |
Krissy Zon | N/A |
JR Contracting, LLC* ** 499 Carlton Drive Bentleyville, PA 15314 |
Clem Ferri | N/A |
Hogens Heros, Inc. dba J5 Construction* ** 11 Mingo Creek Road Eighty Four, PA 15330 |
Rebecca Dunn | $1,095,000.00 |
Mid Atlantic Storage Systems, Inc.* ** 1551 Robinson Road SE Washington Court House, OH 43160 |
Jon Burns | N/A |
Lone Pine Construction* ** 83 Lusk Road Bentleyville, PA 15314 |
Josh Leach | $779,700.00 |
SE Construction Company* ** 3015 Pickering Run Road Marion Center, PA 15759 |
Lora Rising | $763,890.00 |
W. D. Wright Contracting * ** 1200 Sharon Road Ste. 1 Beaver, PA 15009 |
Chandler Lawrence | $652,000.00* |
Bid Advertisement
Sealed Bids are requested by the Ambridge Water Authority at 600 11th Street, Ambridge, PA 15003 until 2:30 P.M. prevailing time, Friday, August 11, 2023 for the Martins Way Water Tank and PRV Vault Modifications. Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids.
Interested parties may view the Profile and Bid Schedule for this Project on the internet at: www.niraengineers.com.
Copies of the Bid Documents may be examined at the office of the Ambridge Water Authority or at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $100.00. An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested. Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided. Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Ambridge Water Authority. Only documents obtained directly from the Engineer will be valid at bid opening.
A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder.
Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442. The Prevailing Wage Scale is included in these Specifications.
Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA).
Adherence to Instructions to Bidders is required.
No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening.
The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid.
Project Scope
The work generally includes, but is not limited to, construction of a new water storage standpipe, including foundation, water and drain lines, and connections to existing facilities. The work also includes furnishing all plant, labor, supervision, and materials necessary to complete the work in accordance with the Contract Plans and Specifications as shown or directed by the Engineer.
Bid Schedule
Item No. | Description | Estimated Quantity |
Unit |
---|---|---|---|
1. |
Mobilization, Bonds, Insurance, and Shop Drawings. |
JOB |
LS |
2. |
100,000 Gallon Glass Lined Water Storage Tank. |
JOB |
LS |
3. |
Concrete Foundation for Glass Lined Tank. |
JOB |
LS |
4. |
Potable Water Mixing System. |
JOB |
LS |
5. |
Site Utility Work Including 6 Inch and 8 Inch PVC Pipe, Valve and Fittings. |
JOB |
LS |
6. |
Site General, Including Clearing and Grubbing, Removal of Existing Fencing and Installation of New Fencing, Gates, Gravel Drive, Site Grading, Seeding and Soil Supplements. Complete In Place. |
JOB |
LS |
7. |
Valve Vault Modification, Complete Per Plan. |
JOB |
LS |
8. |
Erosion and Sedimentation Control Per Plan. |
JOB |
LS |
9. |
Structure for Mounting Electrical Equipment. |
JOB |
LS |
10. |
Electrical Service Entrance. |
JOB |
LS |
11. |
Electrical Panel. |
JOB |
LS |
12. |
Main Grounds. |
JOB |
LS |
13. |
SCADA Panel. |
JOB |
LS |
14. |
Pressure Relief Valve and Pressure Reducing Valve SCADA Signals. |
JOB |
LS |
15. |
Tank Pressure Sensor and Connection to SCADA System. |
JOB |
LS |
16. |
Flow Meter and Conduit and Wiring. |
JOB |
LS |
NIRA Consulting Engineers, Inc.
950 Fifth Avenue, Coraopolis, PA 15108
412.262.3970