Sanitary Sewer Replacement Below Duluth Trading

Project No:

16-756-91

Location:

Robinson Township, Allegheny County, Pennsylvania

Owner:

The Municipal Authority of the Township of Robinson

Manager(s):

Doug Evans

Estimated Cost:

$799,636

*Corrected Figure

**Contract Awarded September 14, 2023

ContractorContact PersonBid Amount
The Municipal Authority of the Township of Robinson
5200 Campbells Run Road
Pittsburgh, PA  15205
Leo GismondiN/A
Alex E. Paris Contracting Company, Inc.
1595 Smith Twp.  State Road (Rt. 18)
Atlasburg, PA  15004
Todd Bogar$801,849.60*
Greenland Construction Inc.
8908 Clearfield-Curwensville Hwy
P.O. Box 287
Clearfield, PA  16830
Bob Greenland$883,000.00
W. A. Petrakis Contracting, LLC
1501 Pontiac Court
Export, PA  15632
Joe UrbanN/A
Mele & Mele & Sons, Inc.
One Mele Place
Braddock, PA  15104
April SchwalbN/A
DemEx, LLC
125 Pflugh Road
Butler, PA  16001
George StewartN/A
Jet Jack, Inc.
5020 Thoms Run Road
Oakdale, PA  15071
Blaine Popp$769,681.00
Rudzik Excavating
401 Lowellville Road
P.O. Box 208
Struthers, OH  44471
Jim Tressa$609,895.00* **
D&M Contracting, Inc.
1868 Lions Club Road
New Alexandria, PA  15670
Chris GallickN/A
BKG Industries, Inc.
3055 Santiago Road
Imperial, PA  15126
Gary Keisow$649,002.20*
Niando Construction, Inc.
620 Long Road
Pittsburgh, PA  15235
Holly HeilmanN/A
D & M Contracting, Inc.
1868 Lions Club Road
New Alexandria, PA  15670
Chris GallickN/A

Bid Advertisement

Sealed Bids are requested by the Municipal Authority of the Township of Robinson at 4200 Campbells Run Road, Pittsburgh, PA 15205 until 3:00 P.M. prevailing time, Thursday, September 7, 2023 for the Sanitary Sewer Replacement Below Duluth Trading. Bids will be opened publicly and read aloud immediately after the closing time for receipt of Bids. 

Interested parties may view the Profile and Bid Schedule for this Project on the internet at: www.niraengineers.com. 

Copies of the Bid Documents may be examined at the office of the Municipal Authority of the Township of Robinson or at the office of NIRA Consulting Engineers, Inc., 950 Fifth Avenue, Coraopolis, Pennsylvania 15108. Copies thereof may be obtained from the office of NIRA Consulting Engineers, Inc., upon payment of a non-refundable sum of $100.00. An additional charge of $15.00 will be required for handling of Plans and Specifications when shipping is requested. Checks are to be made payable to NIRA Consulting Engineers, Inc. Bids must be submitted on the forms provided, and completed in strict accordance with the instructions provided. Each Bid must be accompanied by a Bid Bond, in the form of a Certified Check or Corporate Surety Bid Bond, in the amount of ten percent (10%) of the Bid Proposal made in the favor of the Municipal Authority of the Township of Robinson. Only documents obtained directly from the Engineer will be valid at bid opening. 

A Performance Bond, Labor and Material Payment Bond, and Maintenance Bond in the amounts specified within the Contract Documents will be required of the successful Bidder. 

Bidders on this work will be required to comply with the Provisions of the Pennsylvania Prevailing Wage Act 442. The Prevailing Wage Scale is included in these Specifications. 

Bidders on this work will be required to comply with the Provisions of the Public Works Employment Verification Act (PWEVA). 

Adherence to Instructions to Bidders is required. 

No Bid or any part thereof shall be withdrawn by Bidder for a period of sixty (60) days subsequent to the Bid Opening. 

The right is reserved by the Owner to reject any or all Bids or parts of bids and to waive technical defects in any Bid. 

Project Scope

The work generally includes the removal of existing sanitary sewer pipe and manholes and the replacement with new manholes, SDR-35 sanitary sewer pipe, sanitary sewer reconnections, and surface restoration. Sanitary sewer replacement will also involve utility line stream crossings and temporary stream crossings. 

Bid Schedule

Item No.DescriptionEstimated
Quantity
Unit

1. 

Mobilization, Bonds, Insurances, Shop Drawings, Photo Documentation, and Construction Stakeout. 

JOB 

LS 

2. 

Clearing and Grubbing. 

JOB 

LS 

3. 

Finish Grading, Topsoil, Soil Supplements, Seeding, Mulching, and Fertilizer. 

JOB 

LS 

4. 

Miscellaneous Incidental Work. Includes Removal, Reinstall and/or Replace Fencing, Walls, Driveways and Access Drive Restoration, Small Structures and All Other Items Not Specified Herein. Includes All Materials, Labor and Equipment to Complete. 

JOB 

LS 

5. 

Erosion and Sedimentation Control. Includes Temporary Seeding (As Required) and Implementation, Maintenance and Removal (If Applicable) of All Erosion Control Devices and Practices As Shown on the Construction Drawings and Also Required by the Technical Specifications. 

JOB 

LS 

6. 

Waterline Crossing Steel Plate, As Shown on Plan. 

1 

EA 

7. 

12 Inch PVC SDR-35 Pipe (0’-8’ Depth). Includes Removal and Disposal of Existing Pipe, and Trench Dewatering. Complete In Place. 

507 

LF 

8. 

12 Inch PVC SDR-35 Pipe (8’-10’ Depth). Includes Removal and Disposal of Existing Pipe, and Trench Dewatering. Complete In Place. 

472 

LF 

9. 

12 Inch PVC SDR-35 Pipe (10’-12’ Depth). Includes Removal and Disposal of Existing Pipe, and Trench Dewatering. Complete In Place. 

340 

LF 

10. 

12 Inch PVC SDR-35 Pipe (12’-14’ Depth). Includes Removal and Disposal of Existing Pipe, and Trench Dewatering. Complete In Place. 

356 

LF 

11. 

Spot Repair of Existing 8 Inch Pipe with 8 Inch SDR-35 PVC Pipe. Includes Pipe, Bedding, Connection, and Appurtenances. Complete In Place. 

6 

LF 

12. 

External Harness for 12 Inch SDR-35 Sewer Pipe (Pipe Slopes Greater Than 20%). Includes Harness, Hardware, and 4 Mil Polywrap. Complete In Place. 

28 

EA 

13. 

Concrete Encasement of 12 Inch SDR-35 Sanitary Sewer Pipe. Complete In Place. 

31 

CY 

14. 

Standard 48 Inch Diameter Manhole, 8 Foot Depth. Includes Removal and Disposal of Existing Manhole. Complete In Place. 

14 

EA 

15. 

Extra Depth 48 Inch Diameter Precast Concrete Manhole. 

35.4 

VF 

16. 

Standard Manhole Frame and Cover. Complete in Place. 

7 

EA 

17. 

Watertight Manhole Frame and Cover. Compete In Place. 

7 

EA 

18. 

Trench Plugs (As Detailed). Complete In Place. 

4 

EA 

19. 

Gravel Driveway Access Restoration At Utility Crossings. Including Gravel and Geogrid Underlay (As Detailed). 

69 

SY 

20. 

Damaged Gravel Access Drive Restoration. Including Gravel and Geogrid Underlay (As Detailed). 

JOB 

LS 

21. 

Temporary Stream Crossing. Including Gravel Approach, Cofferdam, Diversion Pipe, Labor, Material, Equipment, and All Other Components to Complete As Shown on Plans and Details. 

1 

EA 

22. 

Utility Line Stream Crossing Bypass. Includes Cofferdam, Diversion Pipe, Labor, Materials, Equipment, and All Other Components to Complete As Shown on Plans and Details. 

2 

EA 

23. 

Pumped Utility Line Stream Crossing Bypass. Includes Cofferdam, Pump, Intake Hose, Outflow Hose, Energy Dissipater, Water Filter Bag, Labor, Materials, Equipment, and All Other Components to Complete As Shown on Plans and Details. 

1 

EA 

24. 

Bypass Pumping of Sanitary Sewer Flows. 

JOB 

LS 

25. 

R-7 Rip-Rap Rock Lining (As Detailed). 

250 

SY 

NIRA Consulting Engineers, Inc.

950 Fifth Avenue, Coraopolis, PA 15108
412.262.3970